Facebook

Facebook

GABS Project

  • Conducted engineering site survey.
  • Install Metro – E equipment at site once the survey report has been approved.
  • Performed testing & commissioning after the installation completed by using using PON power meter.
  • Prepare acceptance testing report for customer before hand over.