Facebook

Facebook

Maxis NGBB Project

  1. We start with rod-ding in order to check whether the underground sub duct is blocked.
  2. After checking then we will proceed with fiber optic penetration
  3. Fiber laying within the housing area depends on customer requirement.
  4. Outdoor patch panel that connects fiber optic link into the house. We did splicing for the pigtail to connect with the fiber optic cable and to the patch panel.
  5. We did the set up for ONU (optical network unit) when then connection is up.